P-11 Contactor in Amine Sweetening Plant

P-11 Contactor in Amine Sweetening Plant


CONTACTORS IN AMINE TREATING PLANTS (34 pages and 15 illustrations) This manual describes the equipment and operating procedures of an amine treating contactor tower. Both Metric and English units of measurement are used so students can work in units with which they are familiar.

Covered Subjects:

  • Contactor tower types; trayed and packed
  • Principles of natural gas sweetening with amine type chemicals
  • Temperature rise due to the heat of reaction between acid gas and amine
  • Water removal from amine
  • Operating procedures for shut down and start up
  • Control points: lean amine temperature, solution flow and level control of inlet separator and contactor Troubleshooting procedures for foaming, carryover, corrosion and excessive acid gas in treated gas

Questions and problems are included throughout the text with answers in the back that allow students to check their understanding of the subject.

Estimated self-study time: 4 hours

Add To Cart
P-11 Contactors in Amine Sweetening Plants - Knowledge Validation Test CD

The P-11 Knowledge Validation Test CD, is a CD disc that has all of the photographs, diagrams, illustrations and examples as printed in the P-11 training manual combined in a .pdf file.

Answers to both SI and USCS unit validation test questions in the manual are included along with scoring information. Multiple Knowledge Validation Test CD orders will be combined onto a single disc.

An experienced PLP instructor can travel to your site to lead a classroom training program. Contact PLP for more information.

Add To Cart