P-3 Contractor in Dehydration Plant

P-3 Contractor in Dehydration Plant


CONTACTOR IN DEHYDRATION PLANT (30 pages with 14 illustrations) This manual describes the contactor tower used in glycol dehydration plants and the operating procedures for this equipment. Both Metric and English units of measurement are used so students can work in units with which they are familiar.

Covered Subjects:

  • Description of contactor; trayed or packed tower
  • Principles of gas dehydration with glycol absorption
  • Effects of gas temperature, glycol flow rate and glycol concentration on water vapor removal from gas
  • Natural gas moisture dew point is defined
  • Procedures for start-up, shutdown, and routine operations
  • Troubleshooting procedures for foaming and carryover

Questions and problems are included throughout the text with answers in the back that allow students to check their understanding of the subject.

Estimated self-study time: 4 hours

Add To Cart
P-3 Contractor in Dehydration Plant - Knowledge Validation Test CD

The P-3 Knowledge Validation Test CD, is a CD disc that has all of the photographs, diagrams, illustrations and examples as printed in the FP-3 training manual combined in a .pdf file.

Answers to both SI and USCS unit validation test questions in the manual are included along with scoring information. Multiple Knowledge Validation Test CD orders will be combined onto a single disc.

An experienced PLP instructor can travel to your site to lead a classroom training program. Contact PLP for more information.

Add To Cart